home *** CD-ROM | disk | FTP | other *** search
/ Space & Astronomy / Space and Astronomy (October 1993).iso / mac / TEXT / SPACEDIG / V13_5 / V13_513.TXT < prev    next >
Internet Message Format  |  1991-06-28  |  18KB

  1. Return-path: <ota+space.mail-errors@andrew.cmu.edu>
  2. X-Andrew-Authenticated-as: 7997;andrew.cmu.edu;Ted Anderson
  3. Received: from hogtown.andrew.cmu.edu via trymail for +dist+/afs/andrew.cmu.edu/usr11/tm2b/space/space.dl@andrew.cmu.edu (->+dist+/afs/andrew.cmu.edu/usr11/tm2b/space/space.dl) (->ota+space.digests)
  4.           ID </afs/andrew.cmu.edu/usr1/ota/Mailbox/Ec:Cft600WBw09j05Z>;
  5.           Thu,  9 May 91 02:23:53 -0400 (EDT)
  6. Message-ID: <cc-CfnK00WBwI9hE4V@andrew.cmu.edu>
  7. Precedence: junk
  8. Reply-To: space+@Andrew.CMU.EDU
  9. From: space-request+@Andrew.CMU.EDU
  10. To: space+@Andrew.CMU.EDU
  11. Date: Thu,  9 May 91 02:23:48 -0400 (EDT)
  12. Subject: SPACE Digest V13 #513
  13.  
  14. SPACE Digest                                     Volume 13 : Issue 513
  15.  
  16. Today's Topics:
  17.               Re: SPACE Digest V13 #499
  18.            Ulysses Status for 05/03/91 (Forwarded)
  19.                PLEASE REMOVE ME
  20.         Re: Terraforming Mars?  Why not Venus?
  21.           Re: why _I_ think we need a space station
  22.           Re: Want info. on SETI project???
  23.               Re: SPACE Digest V13 #494
  24.      Re: Galileo Update On CNN  atmosphere probe question
  25.               Re: Why the space station?
  26.             SPACE Digest V13 #499
  27.               Re: Why the space station?
  28.               Re: Why the space station?
  29.  
  30. Administrivia:
  31.  
  32.     Submissions to the SPACE Digest/sci.space should be mailed to
  33.   space+@andrew.cmu.edu.  Other mail, esp. [un]subscription requests,
  34.   should be sent to space-request+@andrew.cmu.edu, or, if urgent, to
  35.              tm2b+@andrew.cmu.edu
  36.  
  37. ----------------------------------------------------------------------
  38.  
  39. X-Delivery-Notice:  SMTP MAIL FROM does not correspond to sender.
  40. Date:    Tue, 07 May 91 09:50 CDT
  41. From: Bob Rehak Ext. 3-9437
  42.  <A20RFR1@MVS.CSO.NIU.EDU>
  43.          (AIS Central Services  -  Swen Parson 146)
  44. Subject: Re: SPACE Digest V13 #499
  45.  
  46. The NASA Headline News for 05/02/91 mentioned a school program
  47. called MATHCOUNTS.  How can I get more information on this program?
  48.  
  49. |--------------------------------------------------------------------|
  50. | Bob Rehak, DBA At Large, BITNET: A20RFR1@NIU                       |
  51. |--------------------------------------------------------------------|
  52.  
  53. ------------------------------
  54.  
  55. Date: 6 May 91 22:34:37 GMT
  56. From: usenet@ames.arc.nasa.gov  (Peter E. Yee)
  57. Subject: Ulysses Status for 05/03/91 (Forwarded)
  58.  
  59.  
  60.                      ULYSSES MISSION STATUS
  61.                            May 3, 1991
  62.  
  63.  
  64.      Routine spacecraft operations and data collection remain the
  65. primary activities as Ulysses heads for Jupiter.  Today the
  66. spacecraft is approximately 456 million kilometers (283 million
  67. miles) from Earth, cruising at a heliocentric velocity of 79,200
  68. kilometers per hour (50,500 miles per hour).
  69.  
  70.      Standard precession maneuvers to re-point the high-gain
  71. antenna toward Earth are being conducted about every five days. 
  72. One such maneuver was performed today.  Real-time operations and
  73. recovery of tape recorder data during each daily eight-to-ten
  74. hour pass over the Goldstone Deep Space Network facility are
  75. being conducted from the mission control center at JPL.
  76.  
  77.      A command sequence to return various components of the
  78. spacecraft to their normal thermal environment (prior to
  79. occurrence of the wobble) was successfully carried out April 17. 
  80. The sequence involved switching off the spacecraft's thruster
  81. heaters and switching on other heaters to maintain specific
  82. temperatures for various onboard electronics components.
  83.  
  84.      Ulysses is a five-year mission to study the sun's poles and
  85. interstellar space beyond the poles.  The spacecraft, launched
  86. Oct. 6, 1990, is managed jointly by the European Space Agency and
  87. NASA's Jet Propulsion Laboratory.
  88.  
  89. ------------------------------
  90.  
  91. X-Ns-Transport-Id: 0000AA00047A34D82BD0
  92. Date:     Tue, 7 May 1991 14:47:35 PDT
  93. From: Lisa_M._Owen.ES_M2@xerox.com
  94. Subject: PLEASE REMOVE ME
  95. Reply-To: Lisa_M._Owen.ES_M2@xerox.com
  96.  
  97. TO THE OWNER,
  98.  
  99. I can't seem to be albe to remove myself from this DL.  Could you please help me out.  
  100.  
  101. Thanx in advance,
  102.  
  103. Lisa
  104.  
  105. ------------------------------
  106.  
  107. Date: 7 May 91 01:52:31 GMT
  108. From: stanford.edu!agate!lightning.Berkeley.EDU!fcrary@decwrl.dec.com  (Frank Crary)
  109. Subject: Re: Terraforming Mars?  Why not Venus?
  110.  
  111. In article <1991May6.200227.27120@zoo.toronto.edu> henry@zoo.toronto.edu (Henry Spencer) writes:
  112. >Exactly the same is true on Mars.  The surface of Mars is in vacuum for all
  113. >biological purposes.  Also all mechanical purposes; a pressure hull for the
  114. >Martian surface has to be just as strong as one for space.
  115.  
  116. Mars' atmosphere IS important for some mechanical purposes: Heat Transfer.
  117. It is MUCH easier to dump excess heat into the Martian environment than     
  118. into a deep space. This is especially usefull for a spacesuit, where
  119. the cooling systems account for a BIG chunk  of the suit mass.
  120.  
  121.                     Frank Crary
  122.                     UC Berkeley
  123.  
  124. ------------------------------
  125.  
  126. Date: 7 May 91 06:48:28 GMT
  127. From: wuarchive!usc!jarthur!nntp-server.caltech.edu!ptimtc!rdmei!icspub!astemgw!kuis!rins!will@louie.udel.edu  (will)
  128. Subject: Re: why _I_ think we need a space station
  129.  
  130. In article <21622@crg5.UUCP>, szabo@crg5.UUCP (Nick Szabo) writes:
  131. >
  132. >On that subject, here is a step that _would_ contribute significantly
  133. >to space colonization -- the development of extraterrestrial resources
  134. >and industries.
  135. >
  136.  
  137.     On this one, I have a question.  I read about 15 years ago, in one of
  138.     those children science mags.  Because, at that time I was around 16 yrs.
  139.  
  140.     So, I read that there was an astroid about 15KM long orbiting very close
  141.     to the earth, and in an orbit that perhaps we could get to it and use
  142.     it as a base or what-ever.  Have any of you heard of this astroid.
  143.  
  144.  
  145.                             Will....
  146.  
  147. ------------------------------
  148.  
  149. Date: 7 May 91 14:59:54 GMT
  150. From: infonode!hychejw@uunet.uu.net  (Jeff W. Hyche)
  151. Subject: Re: Want info. on SETI project???
  152.  
  153. tlijy@cc.curtin.edu.au writes:
  154.  
  155. >George Gallup Jr says fifty per cent of Americans share the belief that there
  156. >are 'people somewhat like ourselves living on other planets in the 
  157. >universe'. 
  158.  
  159.     I am currently reading a big fat fuzy(329 pgs) called First
  160. Contact, The Search for Extraterrestrial Intelligence.  It a hard bound
  161. book from Ben Bova and Byron Preiss, Editors that deals with the
  162. subject.  Also you might check out a rather old book from Pengin Press
  163. entitiled On Civilized Stars, by Jospoh Bosher(sp). (Yes I'm a SETI nut,
  164. no UFO or little green men, just radio astronomy.)
  165. -- 
  166.                                   // Jeff Hyche           
  167.     There can be only one!    \\ //  Usenet: hychejw@infonode.ingr.com
  168.                                \X/   Freenet: ap255@po.CWRU.Edu
  169.  
  170. ------------------------------
  171.  
  172. Date: 7 May 91 16:59:32 GMT
  173. From: wuarchive!rex!rouge!dlbres10@decwrl.dec.com  (Fraering Philip)
  174. Subject: Re: SPACE Digest V13 #494
  175.  
  176.  
  177. Keep in mind, Saturn >whatever< may be cheaper today than back then.
  178. After all, back then it was a risky research project to beat those
  179. darn Russkies to the moon.
  180.  
  181. --
  182. Phil Fraering
  183. dlbres10@pc.usl.edu
  184. ''It's a Flash Gordon/E.E. Smith war, with superior Tnuctip technology
  185. battling tools and weapons worked up on the spot by a billion Dr.
  186. Zarkovs.`` - Larry Niven, describing the end to _Down in Flames_.
  187.  
  188. ------------------------------
  189.  
  190. Date: 7 May 91 01:42:24 GMT
  191. From: stanford.edu!agate!lightning.Berkeley.EDU!fcrary@decwrl.dec.com  (Frank Crary)
  192. Subject: Re: Galileo Update On CNN  atmosphere probe question
  193.  
  194. In article <1967@mpirbn.mpifr-bonn.mpg.de> p515dfi@mpirbn.UUCP (Daniel Fischer) writes:
  195. >...I bet the designers of the probe have thought very
  196. >hard about what it might look like inside or inbetween Jupiter's clouds - and
  197. >decided *then* that a camera would be a waste of weight and money. Sure, in
  198.  
  199. I have spoken with some of the NASA/Ames people who designed the atmospheric
  200. probe. They didn't have to think about what the camera might see. They
  201. had NO choice. They wanted a camera, but it was just not possible.
  202. The camera did not fit, since video is so hard to transmit back to the
  203. orbiter. To add the camera would not only require more mass and power
  204. for the camera, but also LOTS more power and mass to transmit back at
  205. the images. The probe, as it was actually built, transmites at only
  206. 128 bits/sec. A low resolution, black and white image is, ~16 kilobits.
  207. (the probe lacks computers to do data compression). This image would
  208. take to probe 2 min. to transmit...
  209.  
  210.                     Frank Crary
  211.                     UC Berkeley
  212.  
  213. ------------------------------
  214.  
  215. Date: 7 May 91 12:15:03 GMT
  216. From: sdd.hp.com!caen!news@decwrl.dec.com  (Ken Sheppardson)
  217. Subject: Re: Why the space station?
  218.  
  219. john@newave.UUCP (John A. Weeks III) writes:
  220.  
  221. >You are not going to be building moon ships in orbit (Fred
  222. >is not going to be an assembly hanger), and I doubt that you are going to 
  223. >see Fred used as a gas station....
  224.  
  225.   Actually, we are indeed planning on building (or at least servicing)
  226.   'moon ships' in orbit on SSF. (I say 'we' because I work in the office
  227.   that makes plans for such things.)
  228.  
  229.   You may be right about refueling, although we've yet to completed a
  230.   thorough risk assesment to determine whether or not we can keep 
  231.   _tanked_ LTV's (Lunar Transfer Vehicles) on station.
  232.  
  233.   Of course to accommodate LTV processing or any other type of vehicle
  234.   servicing, you need to grow beyond the not yet funded 'follow on phase'
  235.   (EMCC)
  236.  
  237. ===============================================================================
  238.  Ken Sheppardson                                  Email: kcs@sso.larc.nasa.gov
  239.  Space Station Freedom Advanced Programs Office   Phone: (804) 864-7544
  240.  NASA Langley Research Center, Hampton VA         FAX:   (804) 864-1975
  241. ===============================================================================
  242.  
  243. ------------------------------
  244.  
  245. ReSent-Message-ID: <Added.4c9oHwS00UkTEI=k9m@andrew.cmu.edu>
  246. Resent-Date:  Tue, 07 May 91 20:18:12 EDT
  247. Resent-From: Tommy Mac <18084TM@msu.edu>
  248. Resent-To: space+@andrew.cmu.edu
  249. Date:         Tue, 7 May 91 02:14:11 EDT
  250. Reply-To: space+%ANDREW.CMU.EDU@msu.edu
  251. From: space-request+%ANDREW.CMU.EDU%CARNEGIE.BITNET@msu.edu
  252. Subject:      SPACE Digest V13 #499
  253. Comments: To: space+@ANDREW.CMU.EDU
  254. To: david polito <15432DJP@MSU.BITNET>, Tom McWilliams <18084TM@MSU.BITNET>
  255.  
  256. Subject: Bone-head play
  257.  
  258. >>The computer that was used on the original Apollo Landings had only 64K of
  259. >>core memory.
  260. >>
  261. >>It's teeny sure, but they did it with tubes back then.
  262.  
  263. >Are you sure about this?  The IBM 360 series computers (all solid state)
  264. >had existed for several years before the first Apollo landing in 1969.
  265.  
  266. No, not at all.  In fact, as many private E-mail messages have pointed out,
  267. I was completely wrong.  Apollo used ferrite-ring type memory, much smaller
  268. and lighter than tubes, a bit larger than IC's.
  269.  
  270. My only defense is this;  the point I was trying to share, that I found so
  271. amazing, is that we put people on the moon with ONLY 64K ?!?
  272.  
  273. Jeez, Nintendos use more than that.
  274.  
  275. Tommy Mac
  276. Acknowledge-To: <18084TM@MSU>
  277.  
  278. ------------------------------
  279.  
  280. Date: 7 May 91 02:48:11 GMT
  281. From: unmvax!uokmax!rwmurphr@ucbvax.Berkeley.EDU  (Robert W Murphree)
  282. Subject: Re: Why the space station?
  283.  
  284. In a office of technology assessment document entitled "A civilian space 
  285. station"  or something like that dated circa 1986 there is a research
  286. article on the history of the space station idea from 1900 to the 80's.
  287. In it you can see the progression of the various incarnations the space
  288. station idea has gone through.  One thing I got out of the article was
  289. that basically the idea of a space station has more to do with science
  290. fiction than any real need.  The plausibility argument goes something 
  291. like this "we're going on a long trip-we're going to have logistics
  292. problems-we need an intermediate stepping stone base to foster longer
  293. trips.  "  Actually my opinion is that this sounds good but doesn't
  294. really reflect the reality of space technology.  Actually, there are
  295. plenty of wonderful scientific missions that haven't been flown for
  296. lack of one thing -the political will to pay for a 500 million+ mission
  297. and booster for a purely scientific mission.  I see no signs that the
  298. exploration of the solar system is really limited by the lack of an
  299. orbital base.  There is an IMMENSE amount of science that can be done
  300. with present technology.  Anybody who reads the astronomical literature
  301. or the NASA solar system exploration documents will know this.  
  302.  
  303. In fact, I think there is every evidence that the real reason for the
  304. space station is political.  A lot of space scientists think its a joke
  305. Who really wants it?  The aerospace companies that will get paid public
  306. money to build it.  Who doesn't want it?  The space scientists whose
  307. missions got canceled or delayed by the space shuttle in the 80's.
  308.      
  309. In summmary, the plausibility of the sequence "first you build reliable
  310. space transportation, then you build a orbital space base, then you go
  311. to the planets" is seriously in question.  All you really need to do 
  312. important space science is a big booster -a titan IV.  The head of the
  313. space telescope institute-Giaconni has said that he would much rather
  314. launch the space telescope into high eliptical orbit and then replace it
  315. with a new copy than low orbit with manned servicing.  The real reason 
  316. for the space station is an ignorant past president who probably consulted
  317. his wife's astrologer to determine which day to announce the space station.
  318. The space station is pure pork.
  319.  
  320. ------------------------------
  321.  
  322. Date: 7 May 91 14:02:10 GMT
  323. From: wuarchive!usc!sdd.hp.com!caen!news@louie.udel.edu  (Ken Sheppardson)
  324. Subject: Re: Why the space station?
  325.  
  326. yamauchi@cs.rochester.edu (Brian Yamauchi) writes:
  327. >
  328. >Is it really less expensive to build an orbital microgravity + life
  329. >sciences lab than an orbital assembly platform?
  330.  
  331.   Actually, it is -- if you can only build one station.
  332.  
  333. >Perhaps now that the scientists have said, in effect, that they don't
  334. >want Freedom, the design could be moved back toward the initial goals
  335. >of supporting lunar and planetary exploration.
  336.  
  337.   A dedicated assembly platform would probably be less expensive than a
  338.   dedicated micro-g/life sciences platform. If you don't have both, however,
  339.   and you're trying to support planetary missions, the price of the assembly
  340.   platform starts to creep up as you start trying to accommodate the
  341.   necessary science. Since the chances of congress funding a second station
  342.   in the next half century are slim we should probably assume we're only
  343.   going to have one, so what we need to look at is how the station would be
  344.   different if we 'only' wanted to process vehicles and conduct only the
  345.   essential science necessary to support exploration. 
  346.  
  347.   If you look at pictures of the station as conceived in the mid 80's, you
  348.   see a 'dual keel' design with keels and booms built off the transverse
  349.   boom. The keels were covered with all sorts of attached payloads,
  350.   satellite repair facilities, etc. As funding and budget got out of hand,
  351.   it was decided that the station be built in two phases. Since you have to
  352.   build the transverse boom before you can add keels, it was decided that
  353.   the first phase would be to build the transverse boom and that the second
  354.   would be to add keels. It seemed like a logical division at the time.
  355.   This had the effect of phasing the operation capability of the station: 
  356.   first science, then vehicle processing (once you had the space). Plans for
  357.   'Phase II' have faded from memory over the years, to the point where we have
  358.   what we have today. A 'dedicated micro-g life sciences platform.'
  359.  
  360.   Given the station we have today, there's not a whole lot of extra
  361.   capability that you could cut if you were to decide that SSF was going to
  362.   be dedicated to the support of lunar and planetary exploration. You still
  363.   need to habitation space, the power generation capability, and the limited
  364.   lab space of the current design. I can't think of any system in the MTC/PMC
  365.   design that could be eliminated or any system capability which could be
  366.   reduced if all you planned to do was to support the Space Exploration
  367.   Initiative (i.e. lunar/mars exploration) PMC is pretty much the minimum
  368.   viable permanently manned station one can come up with given the constraints
  369.   imposed by launch vehicle, the current program structure, contracts already
  370.   awarded, consideration of sunk cost, and politics. To process vehicles,
  371.   you need to add on.
  372.  
  373.   An orbital assembly platform is therefore more expensive than a micro-g
  374.   life sciences lab, since it must be built (in this case) off of an
  375.   already existing 'micro-g/life sciences lab'.
  376.  
  377. >It seems like the original truss + Spar's Mobile Servicing System (and
  378. >possibly FTS) would have been a good start in the direction of a
  379. >platform to facilitate on-orbit assembly of larger spacecraft.
  380.  
  381.   Indeed. One of the advantages of the old 'sticks and balls' erectable truss
  382.   concept was the fact that there was all sorts of open space for the
  383.   addition of growth structure to support vehicle processing facilities
  384.   (hangars) and growth systems and utility lines. One big problem we're having
  385.   right now is that the Pre-Integrated Truss is being designed to allow systems
  386.   to be packed into the orbiter payload bay as tightly as possible and to be
  387.   deployed on orbit with a minimum amount of EVA. Addition of growth structure
  388.   and systems hasn't been a consideration. We're trying to identify locations
  389.   to which we can attach growth structure and we're trying to come up with
  390.   concepts for the addition of growth utilities and systems. One problem we're
  391.   having is that there aren't any growth requirements in the PDRD (the level 
  392.   II requirements document) When there are no requirements for a capability,
  393.   the level of that capability tends to decrease as the design progresses.
  394.  
  395.   At the moment we're working with Lenoir, Kohrs, Moorehead, et al to see
  396.   what we can do before it's too late.
  397.  
  398. ===============================================================================
  399.  Ken Sheppardson                                  Email: kcs@sso.larc.nasa.gov
  400.  Space Station Freedom Advanced Programs Office   Phone: (804) 864-7544
  401.  NASA Langley Research Center, Hampton VA         FAX:   (804) 864-1975
  402. ===============================================================================
  403.  
  404. ------------------------------
  405.  
  406. End of SPACE Digest V13 #513
  407. *******************
  408.